2026 Water Supply

The Roza Irrigation District is actively planning for the 2025 irrigation season water supply.

Our team is currently working with the Roza Board of Directors on how best to manage the irrigation season.

The plan can change as conditions change.  Please continue to visit our 2025 Drought Website for the most up to date information.

2026 reservoir refill info

Outflows at Rimrock are in the process of being reduced to minimum target flows for fish because the atmospheric river…

Read More

2026 Roza drought planning for 35% and 45% water supply & historical comparison

The attached information was reviewed with the Roza Board this week. It includes 35% and 45% water supply scenarios in…

Read More

Feb 2026 water update…it’s not looking good

Roza Water Users: The current snowpack and reservoir status does not bode well for water supply the 2026 irrigation season. …

Read More

2021 Roza Crop Census

Read More

Roza drought year water supply facts & FAQ

Roza-Drought-Year-Water-Supply-Facts-FAQDownload

Read More

2015 Drought and Agriculture – A Study by the Washington State Department of Agriculture

2015-WSDAg-Drought-Economic-Impact-ReportDownload

Read More

Proration schedule

Proration Schedule

Read More

Calculating Days to run at Current Flow Rate

Calculating-Days-to-run-at-Current-Flow-RateDownload

Read More

Yakima Basin Drought Summary

Read More

Pooling diagram example

Read More